Pool project under way
april 10, 2014
Finally the tender is out and we can rest after an intensive period of documentation preparation and detailing. An impressive 61 A1 drawings together with close to 50 A4 pages of tender documentation – and this is only the Architectural package! Then we have all the other seven consultant’s input. All in all a lot to ready for the coming contractor.